NRSWA Signing Lighting & Guarding Training Course
This course incorporates just Unit 01 of the Streetworks Modules – Signing, Lighting & Guarding. It covers where operatives need to park their vehicle on the Highway for what is deemed Temporary Works. It is required by tree surgeons and gardeners and similar operatives if working on the Highway.
Streetworks Qualifications
To obtain any Streetworks ID card candidates must undertake any of the complex units below applicable to their job role at our Centre plus Units LA & Unit 01 or S1 which are mandatory with any other combination of units.
NRSWA Streetworks units LA – 08 Operatives
LA Location & Avoidance of Underground Apparatus
- 01 Signing Lighting & Guarding
- 02 Excavation In the Highway
- 03 Reinstatement and Compaction of Backfill Materials
- 04 Reinstatement of Sub- Base and Road Base in Non-Bituminous Materials
- 05 Reinstatement of Cold lay Bituminous materials
- 08 Reinstatement of Modular Surfaces and Concrete Footways
NRSWA Streetworks units LA – S7 Supervisors
LA Monitoring Location & Avoidance of Underground Apparatus
- S1 Monitoring Signing Lighting & Guarding
- S2 Monitoring Excavation In the Highway
- S3 Monitoring Reinstatement and Compaction of Backfill Materials
- S4 Monitoring Reinstatement of Sub- Base and Road Base in Non-Bituminous Materials
- S7 Monitoring Reinstatement of Modular Surfaces and Concrete Footways